The 60x40m (226 sqm) wall, reaching from the 4th to 8th floor at the side of the Media24 building in Cape Town, South Africa, consists of 896 LED screens
When NEC won the contract to supply a 224 sqm screens to Media24 in Cape Town, the local installer, EyeCom, used an installation technique developed by VTL to install the screens.
VTL advised EyeCom on installation specifics, and provided the required design information to complete the installation to the customer’s satisfaction.
Additionally, VTL were in attendance on site during the installation, ensuring the screen was commissioned and calibrated correctly.
As a result, the screen is now a credit to all involved, with commendations coming from many areas.
VTL advised EyeCom on installation specifics, and provided the required design information to complete the installation to the customer’s satisfaction.
Additionally, VTL were in attendance on site during the installation, ensuring the screen was commissioned and calibrated correctly.
As a result, the screen is now a credit to all involved, with commendations coming from many areas.
The 60x40m (226 sqm) wall, reaching from the 4th to 8th floor at the side of the Media24 building in Cape Town, South Africa, consists of 896 screens.
Watch 1 minute in...we get on the screen!
Watch 1 minute in...we get on the screen!